INSTALLATION:
1.Cut and hem: cut and hem according to the actual size on site before installation.
2.Bottom grooving: the wall using the base plate bottom, the top Surface using light steel’ keel bottom, grooving in the corresponding fold position as to install.
3.Installation: Fix the water corrugated plate with folded, edges on the bottom, plate with structural glue; The Seam joining together
4.Reinforcement: After the top surface is installed, the stick should be supported and strengthened, and the stick should be removed after the glue is cured.
Leave feedback about this
You must be logged in to post a review.