INSTALLATION:
Cleaning the site: ensure that the installation wall is smooth and clean.
Modeling base: The base is made of wooden square, and the base position is in the position of the transverse bar of the PU member. The spacing between wooden square is about 200mm, which can be adjusted according to the situation on site.
Install the light belt: Fix the low-voltage light belt to the side of the wood strip, paste it in an S-shaped surround mode, and adjust the position of the light belt according to the direction of lighting.
Installation member: structural adhesive evenly coated PU member back; Stick it on the wooden side from left to right and bottom to top.
Leave feedback about this
You must be logged in to post a review.