Stainless Steel Panel with Water Corrugate Surface
INSTALLATION:
1.Cut and hem: cut and hem according to the actual size on site before installation.
2.Bottom grooving: the wall using the base plate bottom, the top Surface using light steel’ keel bottom, grooving in the corresponding fold position as to install.
3.Installation: Fix the water corrugated plate with folded, edges on the bottom, plate with structural glue; The Seam joining together
4.Reinforcement: After the top surface is installed, the stick should be supported and strengthened, and the stick should be removed after the glue is cured.
Dear customer,if you have some question for example:MOQ,Delivery Time,More details of product,and else,Welcome to Contact Us,it is very pleasure to received customer response : )
⬆Click the colorful word to browse : )
Leave feedback about this
You must be logged in to post a review.